Go Back   Pacific Northwest Four Wheel Drive Association > Wheeling > Washington Trails > Reiter Trails
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
  #1  
Old 05-23-2012, 08:15 PM
jim putman's Avatar
jim putman jim putman is offline
Washington State Director
 
Join Date: Jan 2009
Location: puyallup wa.
Posts: 1,526
Default update

Reiter Foothills Forest update



Construction has begun on the single-track trails in Reiter Foothills Forest. Photo: DNR
Work is moving along at Reiter Foothills Forest trail.



Parking T-1 and T-2. Construction work at T-1 is completed. All the rock has been placed at T-2.

Construction sequence. We reviewed the construction sequence map for single-track trails showing the expanding system of loops north of the Deer Flats Mainline Road in Area 6. Construction of the "Red" trail on the sequencing map is scheduled to begin construction in early June.



Construction activities. We are stockpiling rock; hired an experienced mini-excavator operator tasked with doing the earthwork of the trail construction; and are arranging for four-months' worth of Washington Conservation Corps (WCC) crew time to begin constructing the trail in June.



Volunteer opportunities. Volunteer work will complement the work to be done by the WCC crews. We will keep you posted on these opportunities.



Section 1, 4x4 trails. While our focus has been on Area 6 trails this winter, we have started to work on Phase 1 trail design in Area 1 as well.



Non-motorized trails. Survey crews should be completing the survey of two future bridge sites. We look forward to getting this information to our engineer so he can begin the design process.



Correction to grant information shared in previous issue

We have decided to separate the continuation of Phase 1 trails into two different grants from the Nonhighway and Off-road Vehicles Activities (NOVA) program:
* Spring/Summer 2012 -- Phase 1 Motorcycle and ATV trail construction beginning July 2013 and ending in June 2015.
* Spring/Summer 2012 -- Phase 1 4x4 trail construction beginning July 2013 and ending in June 2015.



Look for more information about our grant proposals in a future issue. We will let you know how to submit a letter of support for these grant projects.



Reiter Foothills Focus Group Meeting - May 23
This month's meeting will be a progress report of the area. Please bring your calendars so we can schedule volunteer work party days to help with construction of Area 6 trails.



The Reiter Foothills Focus Group meetings are open for all to attend. These are a great way to hear, firsthand, about the progress at Reiter and to provide your input on recreation in the area.



Reiter Foothills Forest Focus Group meetings are from 7 to 9 p.m. every fourth Wednesday of the month in the East Public Meeting Room, Snohomish County Building, 3000 Rockefeller Ave., Everett.



For more information, contact David Way, 360-854-2830.
__________________
Member #40 Hombres jeep club
Region 2 landmatters chairman
Wa. State Director PNW4WDA
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Forum Jump


All times are GMT -7. The time now is 08:46 PM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.